Episcopal High School, a private school in
Bellaire, Texas, hired GRT alumni thru Rice & Gardner Consultants, to Represent the Owner for their new Student Center. The project was built to support the growth of over 800 students. The Student Center features student dining, forward‐thinking STEM and maker spaces, unique art exhibit area, stu
Episcopal High School, a private school in
Bellaire, Texas, hired GRT alumni thru Rice & Gardner Consultants, to Represent the Owner for their new Student Center. The project was built to support the growth of over 800 students. The Student Center features student dining, forward‐thinking STEM and maker spaces, unique art exhibit area, study areas, coffee shop and faculty offices. This project utilized a CMAR procurement method.
Episcopal High School also engaged GRT, thru Rice & Gardner Consultants, to help complete the Hildebrand Athletic Center. The facility is oriented central to the athletic fields and features a state‐of‐the‐art fitness center,
basketball court, with arena‐style seating,
large locker rooms, and an expansive banquet room that overlooks the at
Episcopal High School also engaged GRT, thru Rice & Gardner Consultants, to help complete the Hildebrand Athletic Center. The facility is oriented central to the athletic fields and features a state‐of‐the‐art fitness center,
basketball court, with arena‐style seating,
large locker rooms, and an expansive banquet room that overlooks the athletic fields. This project utilized a CMAR procurement method.
GRT continues the tradition of supporting Episcopal High School on their campus master plan execution. GRT is currently providing Owner's Representative services for their new Visual and Performing Arts Center. The project is in Design Development with the bulk of the time being spent identifying the necessary elements. This versatile per
GRT continues the tradition of supporting Episcopal High School on their campus master plan execution. GRT is currently providing Owner's Representative services for their new Visual and Performing Arts Center. The project is in Design Development with the bulk of the time being spent identifying the necessary elements. This versatile performance venue is planned to include various studio spaces including dance, photography, and film. This project is expected to utilize a CMAR procurement method.
Malala Yousafzai Elementary School is a LEED certified school for Fort Bend ISD. GRT was hired to provide Project Support services during the construction phase of the school. The project was built for the growing district and is a $39M, 140,000‐sf facility that features outdoor classroom stages, breakout learning areas, and a learning st
Malala Yousafzai Elementary School is a LEED certified school for Fort Bend ISD. GRT was hired to provide Project Support services during the construction phase of the school. The project was built for the growing district and is a $39M, 140,000‐sf facility that features outdoor classroom stages, breakout learning areas, and a learning stair central to the facility. This project utilized a CSP procurement method and completed on the revised timeline, under budget.
The Branch School, a private K‐8 school in
Houston, Texas, hired GRT to provide Owner's Representative services from the Master Planning of the campus thru the end of the Design Development Phase of Phase 1, the new middle school. This facility is planned to accommodate learning spaces, faculty offices, science and art maker spaces, a socc
The Branch School, a private K‐8 school in
Houston, Texas, hired GRT to provide Owner's Representative services from the Master Planning of the campus thru the end of the Design Development Phase of Phase 1, the new middle school. This facility is planned to accommodate learning spaces, faculty offices, science and art maker spaces, a soccer field and several outdoor, environmental-friendly learning spaces. This project is under design and expected to utilize a CMAR procurement method.
The City of Galveston Pump Station project consisted of replacing an existing pump station with a new, upgraded pump station with water treatment. GRT provided Project Support Services for the completion of the $16M project. The pump station was engineered to receive redundant power and pumping. The equipment, materials and finishes used
The City of Galveston Pump Station project consisted of replacing an existing pump station with a new, upgraded pump station with water treatment. GRT provided Project Support Services for the completion of the $16M project. The pump station was engineered to receive redundant power and pumping. The equipment, materials and finishes used was designed to withstand up to 150 mph winds. This project utilized a CSP procurement method.
City of Galveston - 14th Street Pump Station and Storm Water Management Project
($30M, Expected Completion 2023)
City of Galveston - Airport Pump Station Replacement/Expansion Project
($9M, Expected Completion 2022)
City of Galveston - 18th Street Storm Water System Replacement Project
($16M, Expected Completion 2022)
Girl Scouts of San Jacinto - New Bay House, Galveston, Texas
(Expected Completion 2022)